Linear Type OPP Hot Melt Bottle Labeling Machine
Product Description
Linear Type OPP Hot Melt Bottle Labeling Machine 1.The machine can be connected with filling machine,capping machine working 2.It can fit for round bottle with one label 3.Adopt the import control system, servo or step in and out of the standard system 4.Adopt cylinder drive rotary bottle structure, turn three positioning way ensure excellent labeling parallel precision and positioning accuracy 5.Main material is stainless steel and advanced aluminum alloy manufacturing, in line with the GMP standard production, firm structure, beautiful and easy
Technical parameter | |
Machine Speed | 1800-3000 bottles per hour |
Applied Bottle | 100-500ML |
Bottle Size | 30-280 mm (H),20-150 mm (W) |
Label Size | 25-300 mm (L), 20-180 mm (W) |
Printer to use air | 5kg/cm2 |
Label Accuracy | ±1mm (Depend on real bottle and label size) |
Compressor Air Supply | 0.3-0.4kfg/cm2 |
Label Roll Size | Φ76 mm, Φ300 mm |
Machine Size | 2000 mm(L)×1000mm(W)×1360mm(H) |
Power/Voltage | AC110/220V, 50/60HZ (Can be customized) |
1. It applies to a row of paste volume, the use of local means glue, glue consumption of small, low running costs.2.Due to the design of high-precision processing requirements of strict and meticulous assembly, so that the stability of the machine running, and production capacity can reach 10,000 bottles / hour.
synthetic bottle speed) internal matching; not send bottles marked function; glue function is not scale-free; bottle labeling
before and after the replacement of the normal type;
4. The host used on home cam design to replace the bottle-type simple; nose tight card using pneumatic means to increase the
convenience of the host.
FQA
Q1:What's your guarantee or the warranty of the quality if we buy your machines? A1:We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,Life long after service. Mean while, our engineers go more than 50 countries for debugging, with rich experience. Q2:When can I get my machine after I paid? A3:We will deliver the machines on time as the date we agreed both side. Q3:How can I install my machine when it arrives? A3:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the machines. Q4:What's the delivery time? A4:30-45 days after the T/T deposit or L/C. Q5:What's min order quantity? A5:1 unit